Phase 1 - Excavation Preparation

alt: Excavation

Moisture removal pipe

alt: Excavation

Moisture removal pipe

alt: Excavation

Exterior cover for moisture vent

alt: Excavation

Better shot of heaving concreate

alt: Excavation

Secondary crack

alt: Excavation

Another shot of the north wall.

alt: Excavation

Moisture vent history

alt: Excavation

Time to move the lumber

alt: Excavation

The lumber's new home - This will get cleaned up later.

alt: Excavation

Previoiusly blocked support column

alt: Excavation

Time to remove lumber storage lumber

alt: Excavation

Lumber storage lumber gone

alt: Excavation

I thought it was time to begin excavation. It was time to remove the facade.

alt: Excavation

Facade gone.

alt: Excavation

Excavation tools

alt: Excavation

Excavation tools and excavation area